High-precision injection molding manufacturing

China-Plus-One Plastic Molding, Engineered in Malaysia.

A custom injection molder since 1994, serving US OEMs and contract manufacturers diversifying away from China. Presses from 55 to 397 US tons, tolerances to ±0.002 in, ISO 9001:2015 — and no Section 301 tariff exposure.

Clamp force
55–397 US tons
Tolerance
±0.002 in
Annual volume
3k–15M pcs
Section 301
No exposure
Send us a part to quote

We reply by the next business day. Full quotation with tooling cost, unit price and DFM feedback in 2 to 10 days.

Get Free Quote

Contact us today to learn more about our services and how we can help you with your next project.

We respond to all enquiries by the next business day.

Industries we serve — global OEMs trust Ichiplas

DysonShimanoJabilHPHIDVS Industry

The Tariff Picture

Lead with what matters most for US-bound OEM procurement: Section 301 exposure — none.

Landed unit cost (typical)
US Domestic
Highest
China
Low (pre-tariff)
Ichiplas · Malaysia
Low to mid
Section 301 / tariff exposure
US Domestic
None
China
High & rising
Ichiplas · Malaysia
None
Logistics time to US East Coast
US Domestic
Days
China
4–6 weeks
Ichiplas · Malaysia
4–5 weeks
English-speaking engineering
US Domestic
Yes
China
Mixed
Ichiplas · Malaysia
Yes
Overmold / insert-mold depth
US Domestic
Yes
China
Yes (variable QA)
Ichiplas · Malaysia
Yes — proven at scale
ESG / labour audit posture
US Domestic
Strong
China
Heightened scrutiny
Ichiplas · Malaysia
ISO + RBA + Intertek WCA

The complex parts other molders decline

Full-range custom injection molding for OEM components — and the specialty processes most shops won't take on.

Overmolding · Insert molding · Multi-material · Two-shot

Overmolded component produced at Ichiplas
Overmolding. Decade-long Dyson partnership; proven repeatability at production scale.
Insert-molded sensor housing produced at Ichiplas
Insert molding. Sensor housings and metal-to-plastic interfaces with tight tolerance windows.

Audit-ready by default

ISO 9001:2015 · Intertek WCA-D02 · RBA-aligned. The audit posture procurement teams require, without a documentation scramble.

ISO 9001:2015

Quality management

Intertek WCA-D02

CSR-audited

RBA-aligned

Responsible Business Alliance

99%

first-pass yield

15M

parts per year

Documentation we supply on request

  • PPAP / FAIR packages
  • CMM first-article reports
  • Certificates of conformance
  • RoHS & REACH declarations
  • California Prop 65 statements
  • UL-recognised resins

These are documents and supplier declarations, not certifications held by Ichiplas — ISO 9001:2015 is the only certification we hold. See how we document quality.

Dyson

Case study — Dyson

A decade of fabric overmolding at scale

For more than ten years, Ichiplas has delivered Dyson's fabric-overmolded components from prototype through high-volume production — the kind of partnership procurement teams write into long-form supplier qualifications.

<2%

wastage at production scale

10+ years

of continuous partnership

Concept to crate

Five Steps. One accountable partner in Johor.

  1. 1

    Design

  2. 2

    Tooling

  3. 3

    Molding

  4. 4

    Finishing

  5. 5

    Assembly

China Plus One FAQ

What is China Plus One manufacturing?
China Plus One is a sourcing strategy that keeps some production in China but adds a supplier in at least one other country, to reduce tariff, supply-disruption and geopolitical risk. Malaysia is one of the most common China Plus One destinations for injection molding. Ichiplas, a Johor Bahru molder since 1994, serves US OEMs and contract manufacturers moving tooling and production out of China.
Do Section 301 tariffs apply to plastic parts molded in Malaysia?
No. Section 301 tariffs apply to goods of Chinese origin, and parts molded by Ichiplas in Malaysia are of Malaysian origin. Most injection molded plastic parts enter the US under HS 3926.90, which carries a 5.3% MFN duty rate. Other US tariffs on Malaysian imports may also apply, so confirm the current rate for your HTS code with your customs broker.
Can Ichiplas take over molds from our Chinese supplier?
Yes. Ichiplas accepts injection molds transferred from other suppliers, including tools currently running in China, so you can move production to Malaysia without necessarily cutting new tooling.
Is injection mold tooling in Malaysia more expensive than in China?
Usually a little. Based on our own quote history, Malaysian tooling typically costs 10–30% more than Chinese tooling of equivalent quality. In return you get English-language engineering communication, contracts under a common-law legal system and faster design iteration. As a guide, a single-cavity mold for a small part in low-grade steel typically costs USD 3,000–15,500.
How long does it take to ship parts from Malaysia to the US?
Sea freight from Port Klang or Pasir Gudang typically takes 18–25 days to the West Coast, 25–30 days to Houston and 28–35 days to New York/New Jersey, port to port. Air freight reaches any major US airport in 3–5 days. Ichiplas ships FOB as standard and supplies the full export documentation package, including a certificate of origin.
How long does it take from RFQ to production parts?
We reply to enquiries by the next business day and send a full quotation, covering tooling cost, unit price, lead time and DFM feedback, within 2–10 days. Mold build typically takes 4–6 weeks for a simple single-cavity tool, 6–10 weeks for a mid-complexity multi-cavity tool and 10–14 weeks for complex tooling, followed by T1 samples and a pilot run before production. Add freight time for delivery to the US.
How does Ichiplas protect my designs and IP?
We sign a mutual NDA before any technical files are exchanged, using your company's template or ours. Agreements are drafted in English and enforceable in Malaysian courts, under a legal system familiar to Western legal teams. Access to customer CAD files is restricted inside the company.
What certifications and quality documentation does Ichiplas provide?
Ichiplas is certified to ISO 9001:2015, which is the only certification we hold. Our facility has been audited under Intertek's Workplace Conditions Assessment (WCA), and our operations are aligned with the RBA Code of Conduct. On request we supply PPAP/FAIR packages, CMM first-article reports, certificates of conformance, RoHS and REACH declarations, California Prop 65 statements and UL-recognized resin documentation.
What volumes and tolerances can Ichiplas handle?
Ichiplas runs production from about 3,000 to 15 million pieces a year on 55–397 US ton (50–360 tonne) presses, holding ±0.002 in (±0.05 mm).

Or, reach us directly if you're ready with more detailed information.

Email

Note: Email us with your 2D/3D CAD files for expedited review.