High-precision injection molding manufacturing

China-Plus-One Plastic Molding, Engineered in Malaysia.

A 35-year custom injection molder for OEMs and contract manufacturers diversifying away from China — with the ISO, RBA, and other quality management systems that procurement teams require.

Industries we serve — global OEMs trust Ichiplas

DysonShimanoJabilHPHIDVS Industry

The Tariff Picture

Lead with what matters most for US-bound OEM procurement: Section 301 exposure — none.

Landed unit cost (typical)
US Domestic
Highest
China
Low (pre-tariff)
Ichiplas · Malaysia
Low to mid
Section 301 / tariff exposure
US Domestic
None
China
High & rising
Ichiplas · Malaysia
None
Logistics time to US East Coast
US Domestic
Days
China
4–6 weeks
Ichiplas · Malaysia
4–5 weeks
English-speaking engineering
US Domestic
Yes
China
Mixed
Ichiplas · Malaysia
Yes
Overmold / insert-mold depth
US Domestic
Yes
China
Yes (variable QA)
Ichiplas · Malaysia
Yes — proven at scale
ESG / labour audit posture
US Domestic
Strong
China
Heightened scrutiny
Ichiplas · Malaysia
ISO + RBA + Intertek WCA

The complex parts other molders decline

Full-range custom injection molding for OEM components — and the specialty processes most shops won't take on.

Overmolding · Insert molding · Multi-material · Two-shot

Overmolded component
Overmolding. Decade-long Dyson partnership; proven repeatability at production scale.
Insert-molded sensor housing
Insert molding. Sensor housings and metal-to-plastic interfaces with tight tolerance windows.

Audit-ready by default

ISO 9001:2015 · Intertek WCA-D02 · RBA-aligned. The audit posture procurement teams require, without a documentation scramble.

ISO 9001:2015

Quality management

Intertek WCA-D02

CSR-audited

RBA-aligned

Responsible Business Alliance

98%

qualification rate

15M

parts per year

Dyson

Case study — Dyson

A decade of fabric overmolding at scale

For more than ten years, Ichiplas has delivered Dyson's fabric-overmolded components from prototype through high-volume production — the kind of partnership procurement teams write into long-form supplier qualifications.

<2%

wastage at production scale

10+ years

of continuous partnership

Concept to crate

Five Steps. One accountable partner in Johor.

  1. 1

    Design

  2. 2

    Tooling

  3. 3

    Molding

  4. 4

    Finishing

  5. 5

    Assembly

Or, reach us directly if you're ready with more detailed information.

Email

Note: Email us with your 2D/3D CAD files for expedited review.

Get Free Quote

Contact us today to learn more about our services and how we can help you with your next project.

We respond to all enquiries within 2 business days.